Pu Cheap Boxing Equipment Factory Introduces The Installation Strategy Of Buoys


Posted November 3, 2020 by taizhouglejin

The pontoon is the basic part of the water social security, so how to install these basic parts correctly? Now follow the Pu Cheap Boxing Equipment Factory to see the process of installing the pontoon:

 
The pontoon is the basic part of the water social security, so how to install these basic parts correctly? Now follow the Pu Cheap Boxing Equipment Factory to see the process of installing the pontoon:

1. Assemble the single reinforced concave-convex S-side pontoon in place according to the coordinate points of the general plan. First, assemble the pontoons together according to the planning model and specific dimensions to form a whole.

2. The buoy earrings are superimposed and connected to improve the wave resistance and torsion resistance of the dock. They are combined in sequence according to the dots of the earrings on the surface of the buoy. The buoys are locked by a short pin connection, and the special tools are used to rotate 45 degrees to complete the latching The outer ring has side bolts on the side of the outer ring to tighten and lock. The washer is installed according to the position of the pontoon. According to this method, other pontoon products can be extended and assembled, and the floating platform of any shape and size can be formed. , Flexible assembly, diversified shapes, and firm structure.

Through the above introduction, Floating Dock Manufacturers hopes that you can simply refer to the content of this article in future use.
-- END ---
Share Facebook Twitter
Print Friendly and PDF DisclaimerReport Abuse
Contact Email [email protected]
Issued By taizhouglejin
Country China
Categories Accounting , Affiliate Program , Architecture
Last Updated November 3, 2020