WATERPROOFING OF STRUCTURES: CHALLENGES AND SOLUTIONS


Posted April 24, 2021 by sunandaglobal21

Sunanda gives waterproofing solutions to the world's largest clock tower situated in UAE.

 
Al Yaqoub Tower is a tall building in Dubai, United Arab Emirates. The tower reached its peak in 2010 and was completed in 2013.

Problem: To avoid seepage from wet areas and make structures durable.
Application: Waterproofing by crystallization.
Conclusion: We have suggested waterproofing by crystallization. It is an economical waterproofing system in the form of dry powder. When applied it becomes an integral part of concrete, so cannot puncture or tear. The system is durable and lasts as long as the concrete.


Location: Sheikh Zayed Road, Dubai, UAE
Client : Al Yaquob Group
Material consultant - Sunanda Speciality Coatings Pvt Ltd.
Email - [email protected]
Website - www.sunandaglobal.com
-- END ---
Share Facebook Twitter
Print Friendly and PDF DisclaimerReport Abuse
Contact Email [email protected]
Issued By Sunanda Global
Phone 09372505357
Business Address SUNSHINE TOWER 36TH FLR S B MARG, PRABHADEVI, PRAB, PRABHADEVI
PRABHADEVI
Country India
Categories Technology , Tourism , Travel
Tags plaster waterproofing additive , waterproofing , waterproofing compound
Last Updated April 24, 2021