MEP design technical consultant by Advantage Engineering


Posted August 17, 2015 by johnsmith001

Compared to system and structural disciplines, the M&E services domain is normally more fragmented with any two tier design system being established inside the sector.

 
By Advantage Engineering Tel: (518) 320-2501
Compared to system and structural disciplines, the M&E services domain is normally more fragmented with any two tier design system being established inside the sector. In an MEP company’s project, the key participants are the MEP design consultant as well as the MEP contractor (which contains respective trade sub-contractors). MEP layout consultants and MEP installers have distinct responsibilities. In a ideal scenario, the MEP consultant remains in charge of developing the MEP design (known because the design-intent) and the company takes the role regarding, spatial coordination (which may be construed as detailed layout in some respects) along with procurement and then taking care of the fabrication and installment process.

In M&E BIM along with conventional MEP CAD composing approaches, the design consultant will get the architectural and structural design drawings/model from your respective parties during his design tenure for your project - the nature of 'design' on the market means that several versions will probably be passed across to the style engineer while he is anticipated to continue with his layout. His/her design-intent is designed to work (spatially that is) with all the architectural and structural drawings/models but as a result of time and financial constraints with the project the Coordination Drawing when passed for the MEP contractor will typically not need enough detail to enable installation i. e. the pre-fabrication and installation details needed for installation. The MEP (M&E) contractor will likely then use his/her skills, information, technical product data as well as other design data to make a services model that is clash free understanding that allows efficient installation, simple fabrication and post-installation accessibility and maintenance.

The Engineered Drawings could have created MEP pre-fabrication models/drawings and also installation layouts that feature enough detail needed to coordinate the services inside of allocated spaces; prefabricate shelving, modules, and assemblies together with efficient runs; and perform installation without on-field re-work. To make this happen, the MEP contractor changes consultant issue drawings drastically sometimes. When one considers which he may typically resize ductwork, separated electrical ladder, use new equipment and re-route pipework when necessary, not to mention changes required as a result of lagging, insulation allowances, quick access to maintainable parts and also hanging of services, then it is apparent that whilst the design-intent might have been in place, the final design (which will still must be approved by the design consultant) changes significantly.

To anyone different, and certainly to those inside the structural or architectural sector where there could be concept development, design advancement and construction documentation levels, this effort from any contractor may constitute 'design' because it is in effect further detailing with the initial design. However, in the building services sector this is simply not referred to as design because the design itself is not affected in line with the parties concerned. The MEP contractor is in fact extending or progressing the style to create coordinated design drawings.

So, while MEP design and mep coordination drawings may continue beyond the drawings/models given by the MEP consultant it isn't called 'design' but is recognized as co-ordination or to be exact 'installation ready, spatial coordination'.

The particular advent of BIM, which can be also being utilised simply by consultants, is seeing greater numbers of design detailing on the market with that MEP professionals (MEP designers) now undertaking more with the drawing role. The nature of animations modelling implies some thought for spatial coordination must exist and it's also certainly true that consultants have become paying more attention for the creation of detailed design and so more spatial coordination. The question remains perhaps the consultant's models can be utilized by installers.

The two tier layout (intent) and design outlining (coordination) environment may continue to exist for the foreseeable future which often may continue to current timing and financial challenges in a industry where financial handle and project deadlines remain fundamental for your industry.

For more information, or to hire experienced mep cad drawings company, contact us here àAdvantage Engineering or by Tel: (518) 320-2501.
-- END ---
Share Facebook Twitter
Print Friendly and PDF DisclaimerReport Abuse
Contact Email [email protected]
Issued By john
Country United States
Categories Business
Last Updated August 17, 2015