How about the SMT Machine CPH Calculations


Posted February 14, 2025 by ICTsmt

The basic formula for CPH offers a starting point, understanding and improving the true efficiency of an SMT production line requires a deeper analysis of the myriad factors at play.

 
In the realm of Surface Mount Technology (SMT), the efficiency of a production line is often gauged by the metric known as Components Per Hour (CPH). At first glance, calculating CPH appears straightforward: divide the number of components placed by the time in hours. However, this simplistic approach belies the intricate factors that significantly influence the actual performance of an SMT line.

Traditionally, manufacturers provide CPH specifications in two ways: "Maximum CPH," representing the peak speed achieved under ideal conditions, and figures based on standards like IPC-9850, which categorise CPH by package type. While these metrics offer a baseline, they often fail to account for the dynamic variables present in real-world production environments.

Several critical elements can cause a substantial disparity between theoretical CPH and actual output:

Machine Downtime: Unplanned stoppages due to maintenance or technical issues can drastically reduce productivity.

Changeover Times: In high-mix, low-volume setups, frequent changeovers are necessary, leading to increased downtime and reduced CPH.

Component Variability: Different components may require varying placement times, affecting the overall throughput.

Operator Efficiency: The proficiency of the personnel operating the machines plays a pivotal role in maintaining optimal performance.

Board Complexity: More complex board designs can lead to longer placement times and increased chances of errors.

To bridge the gap between theoretical and actual CPH, it's imperative to adopt a holistic approach that encompasses these variables. This involves:

Comprehensive Performance Metrics: Beyond CPH, metrics such as Overall Equipment Effectiveness (OEE) provide a more nuanced view of production efficiency, considering factors like availability, performance, and quality.

Regular Maintenance and Training: Ensuring machines are well-maintained and operators are adequately trained can mitigate downtime and enhance performance.

Process Optimisation: Streamlining changeover procedures and optimising component placement strategies can lead to significant improvements in throughput.

Advanced Simulation Tools: Utilising modelling tools to simulate SMT line performance under various scenarios can help in identifying potential bottlenecks and areas for improvement.

More details: https://www.smtmachine.eu/smt-machine-cph-calculation-your-smt-line/
-- END ---
Share Facebook Twitter
Print Friendly and PDF DisclaimerReport Abuse
Contact Email [email protected]
Issued By Mark
Phone 13826534318
Business Address I.C.T Industrial Park, No. 17, Dalong Road, Shigu town, Nancheng District, Dongguan City, Guangdong Province, China
Country China
Categories Industry
Tags smt machine , pick and place machine , smt line
Last Updated February 14, 2025