Industrial Painting Solutions to help with Lakeland Power Plant Remediation and Repainting


Posted December 12, 2018 by bethmshaw22

RAYCO INDUSTRIAL AND LAKELAND ELECTRIC SELECTS INDUSTRIAL PAINTING SOLUTIONS TO REMEDIATE AND REPAINT THE STRUCTURAL STEEL AND SUPPORT MACHINERY FOR THE LAKELAND POWER PLANT

 
The Macintosh facility at Lakeland Electric has undergone a transformation in recent years. The “ Peaker “ unit, an integral component of the power plant, was disassembled and moved from a previous location to the Macintosh plant where it will be reassembled by Rayco Industrial and repainted by Industrial Painting Solutions. The coal fired plant provides power to over two million people from Orlando to Tampa.

“We are very excited to have been selected by Lakeland Electric and Rayco Industrial. The plant is close to our facility in Plant City and is a perfect fit for our company. We look forward to a synergistic relationship between our three companies,” said Matt Yarbrough, Founder, Industrial Painting Solutions.
-- END ---
Share Facebook Twitter
Print Friendly and PDF DisclaimerReport Abuse
Contact Email [email protected]
Issued By Beth Shaw
Country United States
Categories Architecture
Tags construction , electrical , structural steel
Last Updated December 12, 2018