Our team can provide the full life cycle of WiFi services from start to finish. We begin with our user experience workshop for trouble with wifi to identify the requirements for success. Once these success factors have been documented and agreed upon, we the overlay the non-technical experience on the specific facility maps and determine what is required to deliver the experience. Using this approved design, equipment is then identified and procured in preparation for staging and deployment. Staging is performed in a controlled lab environment to ensure adherence to the design. All equipment is labeled to match the design for ease of installation and inventoried so that there should not any issue like I don't have any bars in wifi. Programming of equipment is performed and includes testing to verify the equipment is functional prior to being deployed.
Installation is timed to ensure sensitive equipment is installed in a manner that prevents installation in harsh construction environments. All cabling efforts are performed during Low Voltage rough-in schedules prior to walls being constructed to minimize the installation cost for data closet cleanup. For existing construction equipment is staged and ready to be installed as crews work through a facility. As equipment is installed it is documented in our installation application for real-time feedback to project and engineering resources. Heat mapping is conducted to ensure coverage and proper signal propagation is attained. Data collectors are enabled and begin baseline testing to ensure system wi-fi dorm rooms drops health prior to the site to life and in preparation for initial User Acceptance Testing.